Prototype Mk-X

Why Mk-X?

Because our MVP needs to be miniaturized, the main goals of this iteration on the road to our MK-X module are charge-capturing stability and efficiency regulation when the matrix-style PSCB correlates and integrates with conventional energy storage units.

Yellow lightning bolt icon on a white background

Who ?

Progress Tracker

Stage I: Foundations
(Months 1-2)
Getting the nanowires sorted

*Currently in Progress*

A technical line drawing of a mechanical component or industrial part in blue, illustrated on a light background.
  1. ✅Nanowire Process Map

  2. ⚒️ ≥100 µW/cm² Yield Test

  3. ⚠️Output Consistency (~20%)

STAGE II: The Core
(Months 2-3.5)
Turning it into a product

Scheduled for Q1 2026

Release in March 2026

-

Release in March 2026 -

Icon of multiple electrical plugs connected in a circular pattern.
  1. Final substrate + electrodes

  2. Power RoI Map (Input/Output)

  3. Casing Design & Test

STAGE III: Make It Usable
(Months 3.5-5)
Adding electronics

Scheduled for Q2 2026

Release in April 2026

-

Release in April 2026 -

Blueprint drawing of a circular spaceship or space station with multiple modules and protrusions on a grid background.
  1. PCB power rectifier/connector

  2. Reference circuits + Specs

  3. Dimensions: plug-and-play

STAGE IV: Scale It
(Months 5-6)
Real deployments

Scheduled for Q2/3 2026

Release in June 2026

-

Dream it

Release in June 2026 - Dream it

A digital illustration of a sci-fi vault door with multiple locking mechanisms and a circular design.
  1. System integration model

  2. Standard port testing

  3. Sample kits shipping

The ongoing developments will be updated in the roadmap Bi-Weekly; however, the official roadmap and timing will adapt to our needs and reality.

January 30th, 2026

A-Team Assembled:
Project Focus Groups

Crystal Stack Matrix

In-house development through expert support with Dr. Joel Omale

PMS/MEMS - PCB

Supported by the Silicon Austria Labs GmbH with Dr. Humberto Campanella

HESS Layer - Storage

Supported by the established MTC with Dr. Subhasisa Nath

Casing & Mechanics

Supported by Redsoul Design Ltd.
with Engineer Richard Clough

February 2nd, 2026

Timeline Update:

  • Sprint Doubled

  • Target delivery for the Pilot MVPs remains 2026

  • New CapEx to be resolved momentarily in Q1, 26

  • Roadmap adjustment pending until next week

February 9th, 2026

Roadmap Update (Sprint Doubled)

To match reality and protect scalability, the sprint window is now (more time per stage, fewer forced compromises). Pilot delivery remains 2026, with scaling stretching as needed.

  • STAGE I: Foundations (Months 1–4)Feb–May 2026

  • STAGE II: The Core (Months 4–7)May–Aug 2026

  • STAGE III: Make It Usable (Months 7–10)Aug–Nov 2026

  • STAGE IV: Scale It (Months 10–12)Pilot deployments in Q4 2026

February 23rd, 2026

Stage I advancing:

The nanowire process map is locked, the ≥100 µW/cm² yield test is on the horizon, and output consistency variance remains the key lever being addressed. In parallel, we’re preparing a review paper to formalize the knowledgebase, while casing and mechanical work continues to accelerate; the exact timing of the next transition (including growth testing) will be reflected in the forthcoming roadmap revision. ‍

March 2nd, 2026

Next Update:
Roadmap & Parts

*IN PROGRESS*‍ ‍